Difference between revisions of "Template:F41 F1005 Installation Instructions"

From IVS Wiki
Jump to: navigation, search
(Created page with "==Installation Instructions== ===Mounting the Processing Unit=== #Locate the network drop above the ceiling. It should be terminated with a male Ethernet end (service loop) or...")
 
(Installation Instructions)
 
Line 4: Line 4:
 
#:''Note:'' If the switch does not have POE, a POE injector will need to be installed at the network closet.
 
#:''Note:'' If the switch does not have POE, a POE injector will need to be installed at the network closet.
 
#Using the T20 bit, remove the rubber feet from the bottom of the Axis F41 Main Unit, and replace it with the Axis F8001. This will allow the F41 to be mounted to drywall above the drop ceiling.
 
#Using the T20 bit, remove the rubber feet from the bottom of the Axis F41 Main Unit, and replace it with the Axis F8001. This will allow the F41 to be mounted to drywall above the drop ceiling.
#: [[File:F41RubberFootPlate.jpg|link=https://ipivs.com/wiki/images/d/d3/F41RubberFootPlate.jpg]] [[File:F41-8001btm.jpg|link=https://ipivs.com/wiki/images/1/10/F41-8001btm.jpg]] [[File:F41-8001top.jpg|link=https://ipivs.com/wiki/images/1/13/F41-8001top.jpg]]
+
#: {{img | file = F41RubberFootPlate.jpg}} {{img | file = F41-8001btm.jpg}} {{img | file = F41-8001top.jpg}}
 
#Find the a suitable mounting location for the F41. Using a pencil, mark the location the four anchors will be mounted  
 
#Find the a suitable mounting location for the F41. Using a pencil, mark the location the four anchors will be mounted  
 
#Using a drill and drill bit, drill the mounting locations.
 
#Using a drill and drill bit, drill the mounting locations.
 
#Insert the four anchors and screws (or wall dogs), and mount the F41 into the drywall above the drop ceiling.  
 
#Insert the four anchors and screws (or wall dogs), and mount the F41 into the drywall above the drop ceiling.  
 
#:''Note:'' if there is no drop ceiling make other arrangements for mounting.
 
#:''Note:'' if there is no drop ceiling make other arrangements for mounting.
#: [[File:F41Anchors.jpg|link=https://ipivs.com/wiki/images/0/0d/F41Anchors.jpg]]
+
#: {{img | file = F41Anchors.jpg}}
#: [[File:F41Mounted.jpg|link=https://ipivs.com/wiki/images/d/dd/F41Mounted.jpg]]
+
#: {{img | file = F41Mounted.jpg}}
 
#Connect the network drop to the Axis F41 Main Unit. When connected, the '''NET''', '''STATUS''', and '''POWER''' LEDs will show green on the unit. After approximately one minute, all three indicators should be green.
 
#Connect the network drop to the Axis F41 Main Unit. When connected, the '''NET''', '''STATUS''', and '''POWER''' LEDs will show green on the unit. After approximately one minute, all three indicators should be green.
#:[[File:F41-intialNet.jpg|link=https://ipivs.com/wiki/images/b/bc/F41-intialNet.jpg]]  [[File:F41-confirmNet.jpg|link=https://ipivs.com/wiki/images/e/e5/F41-confirmNet.jpg]]
+
#: {{img | file = F41-intialNet.jpg}}  {{img | file = F41-confirmNet.jpg}}
  
 
===Mounting the Camera===
 
===Mounting the Camera===
Line 18: Line 18:
 
#Mount the camera into the drop ceiling using toggle bolts.  
 
#Mount the camera into the drop ceiling using toggle bolts.  
 
#Run the attached RJ-11 cable to the input labeled '''CAM''' on the Axis F41 Main Unit. Ensure to drill an appropriate hole in the drop ceiling to feed the RJ-11 cable through.
 
#Run the attached RJ-11 cable to the input labeled '''CAM''' on the Axis F41 Main Unit. Ensure to drill an appropriate hole in the drop ceiling to feed the RJ-11 cable through.
#:[[File:Axis F1005 Mounted.jpg|400x300px|link=https://ipivs.com/wiki/images/e/e8/Axis_F1005_Mounted.jpg]]
+
#:{{img | file = Axis F1005 Mounted.jpg | width=300px}}

Latest revision as of 12:43, 10 May 2022

Installation Instructions

Mounting the Processing Unit

  1. Locate the network drop above the ceiling. It should be terminated with a male Ethernet end (service loop) or a biscuit jack. This line will have been ran back to the POE switch.
    Note: If the switch does not have POE, a POE injector will need to be installed at the network closet.
  2. Using the T20 bit, remove the rubber feet from the bottom of the Axis F41 Main Unit, and replace it with the Axis F8001. This will allow the F41 to be mounted to drywall above the drop ceiling.
    F41RubberFootPlate.jpg F41-8001btm.jpg F41-8001top.jpg
  3. Find the a suitable mounting location for the F41. Using a pencil, mark the location the four anchors will be mounted
  4. Using a drill and drill bit, drill the mounting locations.
  5. Insert the four anchors and screws (or wall dogs), and mount the F41 into the drywall above the drop ceiling.
    Note: if there is no drop ceiling make other arrangements for mounting.
    F41Anchors.jpg
    F41Mounted.jpg
  6. Connect the network drop to the Axis F41 Main Unit. When connected, the NET, STATUS, and POWER LEDs will show green on the unit. After approximately one minute, all three indicators should be green.
    F41-intialNet.jpg F41-confirmNet.jpg

Mounting the Camera

  1. Assemble the mounting unit for the Axis F1005.
  2. Mount the camera into the drop ceiling using toggle bolts.
  3. Run the attached RJ-11 cable to the input labeled CAM on the Axis F41 Main Unit. Ensure to drill an appropriate hole in the drop ceiling to feed the RJ-11 cable through.
    Axis F1005 Mounted.jpg