Difference between revisions of "Output Channel Selector Kit"

From IVS Wiki
Jump to: navigation, search
(Wiring the ST-RX2)
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Wiring Diagram==
+
==Device Data Sheets==
 +
{{img | file = Db-rc2st page2.png}} {{img | file = St-rx2 page2.png}}
 +
 
 
==Required Parts and Tools==
 
==Required Parts and Tools==
 
*RDL ST-RX2
 
*RDL ST-RX2
 
*RDL D-RT2ST
 
*RDL D-RT2ST
 
*RDL 24 V power supply
 
*RDL 24 V power supply
*(1) terminal block
 
* Shielded Stranded 22/2 + ground Wire
 
* (1) Single Gang mud ring or triple gang if paired with observation audio kit(s)
 
 
* Stud finder
 
* Stud finder
 
* Fish tape or Glow Rods
 
* Fish tape or Glow Rods
*Drywall Saw
+
* Drywall Saw
 
* Small Screwdriver
 
* Small Screwdriver
 
* Face plate screws
 
* Face plate screws
 +
* Shielded Stranded 22/2 + ground Wire
 +
*(1) terminal block
 +
* (1) Single Gang mud ring
 +
* (1) Single gang decorative faceplate
 +
    "Note:" If used with Control Room Audio kit, triple gang mud rings will be used
  
 
== Mounting the Button==
 
== Mounting the Button==
#Using a stud finder, scan the mounting location of the Verifact D ensure the microphone is not mounted on a stud.
+
#Using a stud finder, scan the mounting location of the DB-RC2ST to ensure the device is not mounted on a stud.
 
#Using a pencil, mark out where the switching button will be located  
 
#Using a pencil, mark out where the switching button will be located  
 
#Cut a hole into the drywall, large enough to fit the mud ring into it securely.   
 
#Cut a hole into the drywall, large enough to fit the mud ring into it securely.   
#: [[File:VerifactDring.JPG|link=https://ipivs.com/wiki/images/4/4d/VerifactDring.JPG|170px]]
+
#: {{img | file = VerifactDring.JPG | width=170px}}
 
#Cut a hole above the drop ceiling to fish lines (if necessary)  
 
#Cut a hole above the drop ceiling to fish lines (if necessary)  
#Using fish tape or glow rods, fish 3 lines of 22/2, two for signal control and one for power. (shown below)  
+
#Using fish tape or glow rods, pass three lines of 22/2 behind the drywall, two for signal control and one for power. (shown below)  
[[File:Db-rc2st wiring.png|link=https://ipivs.com/wiki/images/a/ad/Db-rc2st_wiring.png]]
+
#:{{img | file = Db-rc2st wiring.png}}
 +
#Once the lines are ran, mount the selector to the mud ring
 +
#Gently secure the face plate once mounted
 +
 
 
==Wiring the ST-RX2==  
 
==Wiring the ST-RX2==  
 
#Determine above the ceiling where the ST-RX2 will be mounted  
 
#Determine above the ceiling where the ST-RX2 will be mounted  
 
#Connect the lines ran from the DB-RC2ST as shown  
 
#Connect the lines ran from the DB-RC2ST as shown  
[[File:St-RX2 wiring2.png|link=https://ipivs.com/wiki/images/e/e1/St-RX2_wiring2.png]]
+
#:{{img | file = St-RX2 wiring2.png}}
  
 
''Note:'' The ST-RX2 and DB-RC2ST will draw from the same power source and can be connected together using a terminal block
 
''Note:'' The ST-RX2 and DB-RC2ST will draw from the same power source and can be connected together using a terminal block
  
==Device Data Sheets==
+
==Wiring Diagram==
 +
{{img | file = ST-RX2 General Diagram.png | width=1000px}}

Latest revision as of 13:05, 11 May 2022

Device Data Sheets

Db-rc2st page2.png St-rx2 page2.png

Required Parts and Tools

  • RDL ST-RX2
  • RDL D-RT2ST
  • RDL 24 V power supply
  • Stud finder
  • Fish tape or Glow Rods
  • Drywall Saw
  • Small Screwdriver
  • Face plate screws
  • Shielded Stranded 22/2 + ground Wire
  • (1) terminal block
  • (1) Single Gang mud ring
  • (1) Single gang decorative faceplate
   "Note:" If used with Control Room Audio kit, triple gang mud rings will be used

Mounting the Button

  1. Using a stud finder, scan the mounting location of the DB-RC2ST to ensure the device is not mounted on a stud.
  2. Using a pencil, mark out where the switching button will be located
  3. Cut a hole into the drywall, large enough to fit the mud ring into it securely.
    VerifactDring.JPG
  4. Cut a hole above the drop ceiling to fish lines (if necessary)
  5. Using fish tape or glow rods, pass three lines of 22/2 behind the drywall, two for signal control and one for power. (shown below)
    Db-rc2st wiring.png
  6. Once the lines are ran, mount the selector to the mud ring
  7. Gently secure the face plate once mounted

Wiring the ST-RX2

  1. Determine above the ceiling where the ST-RX2 will be mounted
  2. Connect the lines ran from the DB-RC2ST as shown
    St-RX2 wiring2.png

Note: The ST-RX2 and DB-RC2ST will draw from the same power source and can be connected together using a terminal block

Wiring Diagram

ST-RX2 General Diagram.png